Allied Modular Logo
Special Item Numbers
How To Use Federal Supply Schedule Where Do I Start


Visa - Mastercard - Diners Club - American Express - Discover
We honor all major credit cards

Manufactured By:
Allied Modular Building Systems, Inc.
642 Nicolas Ave.
Orange, CA 92868
Fax (800) 588-6792
Or Call (888) 836-7850 Toll Free
E-mail: gsa@alliedmodular.com

SIN: 361-10--FSC 5410-Prefabricated Storage Buildings
For warehouse purposes only.
SIN: 361-11--FSC 5410-Outdoor Smoking Shelters
Shelter included but not limited to prefabricated modular, Air flow canopies, walkways and site shelters.
SIN: 361-30--FSC5410 Ancillary Services
Allied Modular Building Systems, inc. will offer as a special service when the project size and timetable warrant such purchase

SIN: 361-99--FSC5410 Introduction Of New Products
Modular offices



Includes But Not Limited To: Design Support, Training, Installation, Field Assembly.
Excludes: Construction (defined as construction, alterations or repairs to buildings, structures, or other real property in federal acquisition regulation 36.102). Special ancillary services can be subcontracted by a contractor. However subcontractors must be licensed and bonded and abide by all state and local codes and insuring all work is completed per manufacturers standard instructions for warranty to apply.

All Contractors shall accept full responsibility and liability for all work performed by any and all subcontractors.

361-32 Installation and Site Preparation: Allied Modular Building Systems, Inc. will offer as a special service when the project size and timetable warrant such purchase.

Installation and site preparation services can be subcontracted by a contractor. However subcontractors must be licenced, bonded and abide by all state and local codes and insuring all work is completed per manufacturers standard instructions for warranty to apply. All Contractors shall accept full responsibility and liability for all work performed by any and all subcontractors. Agencies Shall negotiate construction on a case by case basis which shall be priced as a separate line item. All orders must be submitted to the prime contractor. All workmanship must be guaranteed to be free of any defects in workmanship and materials. All construction clauses must comply with all Davis-Bacon regulations. Orders for installation and site preparation can only be in conjunction with orders enclosures on this federal supply schedule.

Back

© 2006 Allied Modular Building Systems, Inc.
Phone (888) 836-7850
Fax (800) 588-6792
Terms & Conditions